More trim has been installed, including the door frames (or most of the door frames) for the bathroom and closet doors, as well as the doors themselves (no hardware yet, though). The last bit of flooring (in the closet) has been installed.
No photographs, because between the position of heavy equipment standing in place because it's still being used and my inept photographic technique (or my lack of mountain-goat grace in clambering to odd positions precariously placed atop table saws or whatever), I have no usable photos.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment