10.17.2008

lack of clever reference to railings and tiles

The tile work is nearly finished - or rather, the tiles themselves are nearly all installed: next, the tile needs to be sealed and the grout applied. But here's a look at the last bit of tile, which is a little ledge behind where the sinks will be (the wood below is just a temporary support):



And here's the pattern at the edges of the floors, along the walls:



The stairway railings have begun to be installed. Here's a first look: