11.30.2008

more doors, more floors

The end keeps getting nearer, as a lot of detail work continues. We've assembled the preliminary contractor's punchlist of all the outstanding items, most of which should be completed next week, the rest of which we'll walk through with the contractor shortly after that. What's left after that point is our own work: assembling and placing a lot of furniture (most of which we bought at Ikea), and rearranging the two downstairs "bedrooms" (currently a bedroom and a study: the bedroom will become the study, the study will become Rose's "crafts" room). That should be finished by Christmas, if we can find time to put everything together.

Here are some photos: the stairs were sanded and refinished, and they look like this (still some trim to be applied along the tops of the pieces on the wall):



The door hardware has been installed on the two pocket doors: the single one on the bathroom door -



- and the set for the closet:

11.14.2008

adored

Much of the work that's been done the last week has been very fine-tuned detail on the woodwork and trim...the sort of thing that's nearly impossible to notice at first, much less photograph.

But yesterday, our bedroom door arrived, and today, it was installed. Here's what it will generally look like, open (which, the upstairs being entirely the private portions of our us*, will be most of the time):



Here's the view of the door closed, with a better view of its detail, as seen from the hallway area at the top of the stairs:



And here's a similar view from inside the bedroom. (The little irregular dots are bits of cork, there to protect the glass, which will be removed.)



* What, you don't like my abstract poetry? That was supposed to have read something like "the private portions of our house" - entirely different from "the private parts of our house"...which would be, I dunno, the plumbing for a start. Or an end.

10.11.2008

floors and doors

Work on the trim continues. Doors have been installed as well for the bathroom and closet.

Here are two shots: one looking into the bathroom and showing the door surround, the other from roughly the same position showing the pocket door half-closed:




Here's a shot from inside the closet, where flooring was finally installed, showing the flooring and also the double pocket doors:

10.09.2008

it continues...

More trim has been installed, including the door frames (or most of the door frames) for the bathroom and closet doors, as well as the doors themselves (no hardware yet, though). The last bit of flooring (in the closet) has been installed.

No photographs, because between the position of heavy equipment standing in place because it's still being used and my inept photographic technique (or my lack of mountain-goat grace in clambering to odd positions precariously placed atop table saws or whatever), I have no usable photos.