9.25.2008

floors and tiles and paint and things

Lots of work getting done the last couple of days. On the exterior: the back window's rough frame-out is nearly done:



Inside: the first coat of paint is on the walls and ceiling:



The tile installer has put down the gypsum-board underlayment. In this shot you can also see a swatch of the accent color that will fill this wall below the ledge at the very top of this image, as well as the alcove in the bedroom. The actual color has more red to it - it's hard to get accurate color given the reliance in this photo on late-afternoon natural light or flash, which tends to wash out darker colors). You can also barely make out the tile we'll be using in the bathroom (more visible at the larger size):



And the flooring has begun to be put in place: